Liquid Nitrogen Safety Guide

CONTROLLING RISKS

The risk assessment should consider at least the following situations;
1. Normal evaporative losses.
2. Filling losses – normally assumed to be about 10% of the vessel’s capacity.
3. Spillage of the vessel’s contents.

Liquid Nitrogen Enquiry